|
|
|
|
Projects
| Naan-Kiryat Gat Railway Line |
|
| Client: |
Ports and Railways Authority |
|
| Country: |
Israel |
|
|
|
|
|
|
| Project Information: |
Work included:
• Feasibility studies.
• Location studies.
• Geometric design.
• Stream realignment.
• Design of drainage system.
• Design of 24 small culverts, five small bridges and retaining walls.
Construction cost: US$ 3.2 million. |
|
|
|
|
|
|